Stormwater Management

Our office is experienced with stormwater management and design. Our engineers can design stormwater management solutions to meet various local, state and federal requirements.

 

The Pennsylvania Department of Environmental Protection (DEP) has developed compliance regulations that must be met for all land development projects in Pennsylvania.  The old design approach of providing rate control is not enough anymore.  Designs must now address volume control and water quality.  Developers must be prepared for increased site development costs associated with these stormwater management design changes.

Storm water Management

We are experienced in working with permitting requirements for stormwater.  We have our own double-ring infiltrometer testing equipment, and complete the onsite testing for existing infiltration rates with our own staff.  We also have an excellent rapport with the review / permitting agency personnel, working with them sometimes on a daily basis.  They appreciate our attention to detail and the completeness of our designs and permit application packages.

What We Do

  • We design stormwater facilities for projects varying in size from small residential backyard drainage issues (see Drainage Design) to full blown stormwater design for large commercial projects that require land development and PADEP Permitting (See Land Development and PADEP Permitting).
  • We perform required soils/infiltration testing in house.

Our Stormwater Management Customers

Lions Den
Meck-Tech provided boundary and topographic survey, land development design, drainage design, road design and Highway Occupancy Permitting, construction stake out and other required permitting services for this facility.  The Stormwater Management for this site was tricky. The site was flat and required multiple underground pipes. A stormwater management pond and associated rip rap swales were used to treat stormwater for this site.

Sunbury Motors KIA
Meck-Tech provided boundary and topographic survey, land development design, drainage design, road design and Highway Occupancy Permitting, construction stake out and other required permitting services for this facility.  The Stormwater Management for this site was a large underground detention system.